
Driveways
New driveways, replacements, extensions and widened aprons. Long acreage drives, gated entries and curved approaches included.
Chuck Perez pours concrete driveways, house slabs, shop slabs and sidewalks around Magnolia and Montgomery County. Formed square, reinforced with rebar, finished by hand.
Pictured: gated driveway replacement, Magnolia TX
Residential and small commercial flatwork across the Magnolia area. Every job starts with proper forms and a steel grid, so the slab holds up to Texas clay and Texas trucks.

New driveways, replacements, extensions and widened aprons. Long acreage drives, gated entries and curved approaches included.

Slabs for metal buildings, workshops, carports, RV pads and equipment storage. Built to carry trucks, lifts and trailers.

Foundation slabs for new homes, additions, garages and guest houses. Formed to your plans and poured with the engineer's reinforcement.

Walkways, porches, patios and pads. Straight runs or curves that follow your fence line, with clean edges and a broom finish.
Real jobs from the Magnolia area. Slide between the formed and reinforced stage and the finished concrete.
Formed and reinforced
Finished
Old surface removed between the brick columns, new forms set to the gate line, full rebar grid on chairs, then a single pour and a hand broom finish.
Concrete is only as good as what happens before the truck shows up. Here is the order Chuck works in on every job.
Stakes and string, then the base is cut or built up so water runs away from the house.
Lumber forms set straight, braced and checked for height and slope.
Steel grid tied and raised on chairs so it sits in the middle of the slab, where it does its job.
Placed, screeded, floated and broom finished by hand. Edges tooled, joints cut.
Foot traffic in a day or two, vehicles after about a week, full strength at 28 days.
Enter rough dimensions and see the square footage, how much concrete the job takes and how many trucks that is. Then send the numbers straight to Chuck.
Tap any photo to see it larger.







Most jobs are within about 30 miles of Magnolia. If you are a little further out, ask. Larger pours travel.
The things people ask before they pour. Anything else, send it with your photos.
Stay off it with vehicles for about seven days. Walking is fine after a day or two. Concrete reaches its design strength at 28 days, so keep heavy trucks off for the first month.
Rebar tied into a grid and raised on chairs stays in the middle of the slab where it adds strength. Mesh usually ends up on the bottom, where it does little. In Montgomery County clay, that difference shows up a few summers later.
All concrete moves. Control joints are cut at the right spacing so any cracking happens inside the joint instead of across the surface. Thickness, steel and a good base keep slabs flat through wet and dry seasons.
Yes. Tear out and haul off can be included in your quote. Mention it when you send photos so the number covers it.
Use the form below. Pick the job type, add a few photos of the area and give rough dimensions. Chuck looks it over and gets back to you with a number or a quick question.
Most work is within about 30 miles of Magnolia, from Montgomery down to Cypress and from Waller over to Spring. Bigger jobs can go further.
Three quick steps. Chuck sees your photos and dimensions before he calls, so the conversation starts with real answers.
Your photos and dimensions land on Chuck's phone as a text, with your address and number.
He reviews them and calls or texts with a price, or a quick question if he needs one more detail.
Pick a date. Forms go in, steel gets tied, the truck shows up, and you have new concrete.
Prefer Facebook? Message Chuck on Marketplace.